What do you all think….
I talked to Nippon Motors, and they said they have f22a6 for 595bux with 40-50k miles on them.
Also my cousin has an extra motor, but with like 160k miles on it and he might offer it to me for 400bux.
I save about 2-300 if I go we my cousin but if I go with Nippon I damn near have a new motor…which I like very very much….lol.
Also if I was to go with the Nippon motor, I was gona transfer my stuff from the motor in my car now, drop it in and crank up the boost to 12-14psi (tuned).
And while riding off that, start the rebuild on the motor I pulled out.
Or
Should I get the motor from my cousin, and start rebuild on that motor, then once done drop it in????
Im just looking for some help/opinions from my cb7 fam, thanks…
I talked to Nippon Motors, and they said they have f22a6 for 595bux with 40-50k miles on them.
Also my cousin has an extra motor, but with like 160k miles on it and he might offer it to me for 400bux.
I save about 2-300 if I go we my cousin but if I go with Nippon I damn near have a new motor…which I like very very much….lol.
Also if I was to go with the Nippon motor, I was gona transfer my stuff from the motor in my car now, drop it in and crank up the boost to 12-14psi (tuned).
And while riding off that, start the rebuild on the motor I pulled out.
Or
Should I get the motor from my cousin, and start rebuild on that motor, then once done drop it in????
Im just looking for some help/opinions from my cb7 fam, thanks…
Comment